For electronics manufacturers operating in complex supply chains, the recurring question is not merely whether a supplier can deliver, but whether internal purchasing, planning, and warehouse data can present one coherent demand picture. The four cases below show that shortage management can improve when stock records, purchase orders, bills of materials, and production plans are treated as a connected planning loop rather than isolated spreadsheets or departmental systems.
Poweronics, a UK manufacturer of electronic gate drivers, tracks around 1,200 components with just 10 employees. When the company brought more production in-house, the pressure on component control rose sharply. Its experience suggests that shortage prevention begins with stock records that planners can trust before any manufacturing order is committed.
After linking inventory records, BOMs, manufacturing orders, and purchasing, Poweronics says it no longer experiences component shortages. Managing Director Colin Hart frames this as a data-trust outcome: “We’ve never had a shortage after adopting MRPeasy,” he says, adding that the physical warehouse matches the system view: “All the components that the software says are in the warehouse – are in the warehouse.”
Reliable component data also improves downstream planning conversations. Hart notes, “Now, our customer experience is fantastic; we can get quotes out very quickly,” a workflow benefit that depends on knowing whether available parts support a build and where gaps appear before production is released.
Stock visibility alone is insufficient if a planner cannot translate upcoming demand into material requirements. FarSounder, a US manufacturer of marine sonar systems, previously used QuickBooks Desktop for accounting and inventory management. As component-tracking complexity grew, the company needed a system that could calculate what should be bought from BOMs, available inventory, and future demand.
Founder and CEO Matt Zimmerman describes the planning impact as direct: “Having the system tell us exactly what we can make with existing inventory and what we need to build a certain number of products made a huge difference,” Zimmerman says. The team can now identify purchase needs and timing rather than manually checking each component requirement.
The reported time saving is material: FarSounder reduced material-planning effort by around 90%. Zimmerman compares the before-and-after cycle: “Using our previous system, it took me a day to understand what parts we needed to order and when,” he says. “With MRPeasy, it takes less than an hour.” For procurement teams, that change turns a day of manual analysis into a shorter review of exceptions, expediting, and supplier options.
Electronics manufacturers often buy specialized parts across borders, where delays can have amplified consequences. If a shortage is discovered only after a manufacturing order is released, production can be stalled for weeks. Exacta Technologies, which makes custom computer hardware and high-performance servers, manages complex BOMs, subcontracting, and multi-stage production, so it needed forward visibility into component needs.
By connecting inventory, purchasing, and production planning, the company can identify shortage risk before it reaches the shop floor. Managing Director Chris Landen explains: “We have continuous visibility into what components we hold and what’s required next,” he says. “That’s been invaluable when dealing with long global lead times and constrained supply chains.”
Exacta reports fewer production interruptions, faster quoting, and more accurate scheduling. The company has also more than doubled its revenue while expanding from 25 to around 70 employees, illustrating how planning reliability can support scaling operations without creating an ever-larger shortage backlog.
A common but risky response to component scarcity is to add safety stock across the board. That can protect short-term builds, yet working capital becomes trapped in parts that may not be consumed soon enough. Blighter Surveillance Systems, a UK radar manufacturer, manages multi-level BOMs with up to 60,000 components and outsources much of its manufacturing. It therefore needs to know not only what it holds internally, but also what it owns at subcontractors.
Blighter gained better visibility into stock movements and requirements through connected planning. Supply Chain Coordinator James Watt describes the cash-and-space discipline: “MRPeasy has helped us hugely with controlling the flow of goods and making sure we haven’t got loads of bits sitting around that we don’t know the use of,” he says. “It has saved us from having too much cash tied up in stock.”
Tracking materials transferred to subcontractors while preserving visibility over quantities and value gives a practical answer to a frequent procurement dilemma: reduce shortage exposure without building an inflated buffer.
| Company | Operating pressure | Connected-planning response | Documented data point |
|---|---|---|---|
| Poweronics | 10-person team managing a growing in-house assembly workload | Trust stock records, check build feasibility, and identify missing materials earlier | tracks around 1,200 components with just 10 employees |
| FarSounder | Accounting inventory tool could not handle complex component planning | Calculate material requirements from BOMs, stock, and upcoming demand | time spent on material planning reduced by around 90% |
| Exacta Technologies | Complex custom hardware, subcontracting, long international lead times | See current holdings and next requirements before scheduling | more than doubled its revenue while growing from 25 to around 70 employees |
| Blighter Surveillance Systems | Large multi-level BOMs and materials held away from own warehouse | Track subcontractor-held stock, quantities, and value to avoid excess | multi-level BOMs containing up to 60,000 components |
Because a stock list may answer only one question: what is on hand? It may not answer how many units can be built, which materials are needed for scheduled demand, or whether supplier lead times allow an order to arrive before production. The cases indicate that shortages often emerge when inventory, purchasing, BOM, and production planning remain separated.
No. Extra stock can reduce the risk of stopping a build, but it also ties up cash and may leave parts unused if designs or demand change. The better objective is to calculate requirements and plan purchasing around lead times so that available material supports real production needs.
Start with inventory accuracy and a reliable BOM-to-requirement calculation. A small team can test the approach on a high-value product family, validate that system stock matches physical stock, and then expand the process to outstanding purchase orders, future demand, and subcontractor-held materials.