By Lucas Anderson, manufacturing transition adviser at Industrial Weekly (WorldIndustrialWeekly) · news@industrialweekly.com
At Chevron's Gorgon facility, a capture train designed for four million tonnes a year injected about 2.26 million tonnes in the year to 30 June 2022, yet the paper claim still booked a full tonne. So: until a treaty-grade registry assigns one tonne to one owner, book reservoir capture and exported-fuel combustion on separate ledgers and print any netting on the cover. The onus sits with whoever nets.
That is the line COP31 — the 31st Conference of the Parties to the UN Framework Convention on Climate Change — should draw. Analysts call this the coming-of-age moment for carbon management, and Gulf treasuries are working the arithmetic on carbon capture and storage (CCS) while pledges are drafted. Into that season, Exxon Mobil filed a confidential challenge to the European Union's carbon capture rules, a dispute aimed at the same boundary questions. The choice is not between optimism and scepticism; it is between a claim that can be audited and one that cannot.
Conclusion first: the physical molecule does not decide ownership; the accounting boundary does. For a fuel exporter, Scope 1 covers emissions released directly at wells, processing trains and reservoirs it operates, while Scope 2 covers purchased energy. Scope 3 covers the value chain, and its dominant entry is use of sold fuel — tonnes that burn in a customer's jurisdiction, where those same molecules enter a national inventory. Capture at a reservoir reduces the operator's Scope 1 and leaves the customer's tonne untouched. Netting the two borrows from a ledger someone else maintains, and a reader cannot tell whether an emission was cut once or counted twice.
Conclusion: a pledge that fails to name its quantity is unreadable. Bohrium's science encyclopedia explains capture with a bathtub: source capture narrows the inlet, direct air capture opens a drain; the entry insists that gross emissions and gross removals stay separate because they are different physical acts. The bioenergy-with-carbon-capture literature summarized on aiwiki.page is stricter: gross captured is what a facility strips from its stream; net removal subtracts supply-chain energy, conversion, transport and storage; avoided emissions come from displacing a dirtier option and do not prove that legacy carbon left the air. It also requires compatible system boundaries, tonnes of CO2 equivalent (CO2e) throughout, and methane and nitrous oxide reported separately, since warming effect depends on the timescale. Methane lost along a supply chain never appears in a CO2 capture claim, however large that claim. On an r/dataisbeautiful thread charting CCS projects, one commenter put it: "The use case for CCS isn't (or at least shouldn't be) to offset the burning of fossil fuels." That is one person's view, flagged as such, but it matches the mechanics: capture reads cleanly against an operator's own stack and murkily against another party's exhaust.
Conclusion: they already assign upstream lanes, but none spans a Gulf reservoir and an importing boiler. California's Low Carbon Fuel Standard (LCFS) runs on the CA-GREET fuel model, Canada applies its Clean Fuel Regulations, European supply chains audit under International Sustainability and Carbon Certification (ISCC EU) schemes, and the US 45Z producer credit rests on attestation. All four share one premise: a fuel carries its accounting identity from the field and claims must trace to documents. They sit side by side on the working surface of Mangrove Systems, a carbon-accounting platform, alongside ISCC surveillance windows and quarterly LCFS reports. Our own review of clean-tech exports and carbon claims made the same point for shipped hardware: a tonne saved abroad is not automatically a tonne owned at home. China's voluntary market issues China Certified Emission Reduction (CCER) credits, with the registry's job being to stop one verified tonne serving two pledges — machinery that stops at the border.
Double counting is mundane. A Chinese analysis of EV charging-station metering follows onsite solar counted as avoided grid purchase on the emissions side and as a cut on the credits side; its warning, in my translation, is that unclear boundaries let extra meters compute the error more precisely. Cargo-scale fuel trades raise the same issue at higher stakes. The producer objection to fence-line accounting has a cement prototype: via CCA Digital Cement Network, an industry representative set out the Global Cement and Concrete Association position — report inside the gate, treat material leaving embedded in product as part of the global total outside direct accounts, and accept that a plant will skip expensive capture if it keeps the liability. Substituting crude for cement gives almost word-for-word the Gulf argument. One gap remains: the Paris Agreement's Article 6.2 already uses corresponding adjustments — an internationally transferred mitigation outcome (ITMO) added to the seller's account and subtracted from the buyer's — to prevent double counting, as the World Bank explains. That is the closest existing template, but it governs state-to-state transfers, not a private pledge netting a cargo combustion.
Conclusion: a large future asset, a small present tonnage, and an audit trail thinner than either. A May 2025 analysis at Gulf International Forum argues the region can push carbon capture and storage costs down substantially by 2050 on hydrocarbon expertise and low labour and land costs. An Oil and Gas Climate Initiative (OGCI) assessment puts the combined 2050 upside from hydrogen exports and carbon capture, use and storage (CCUS) at $15–44bn in gross value added (GVA), supporting, on the report's own framing, 87,000–245,000 jobs. Those numbers turn stored CO2 into an export asset and netting into balance-sheet room.
Physical delivery is far smaller. Chinese industry outlet Tanjiaoyi reports global capture capacity of 68 million tonnes and relays the CCS Industry Development Report (2026), whose credibility test lists explicit project boundaries, baselines, full-lifecycle energy accounting, leakage monitoring, long-term liability arrangements, and monitoring, reporting and verification (MRV) with traceable data. Every item is a boundary rule. Plant data explain why: Reuters reported Chevron's Gorgon design of up to four million tonnes a year and a shortfall it moved to cover with credits; the US Department of Energy logged more than 3.9 million short tons captured at Petra Nova by December 2019, while Oil Change International put its utilisation near 58% before the unit was mothballed in May 2020. Cost estimates vary as widely as performance: Wood Mackenzie's full-chain figure of $20–150 per tonne, cited by KAPSARC, sits far above most compliance carbon prices. Sam Leon's Datadesk account of a 2023 investigation notes the US Environmental Protection Agency publishes only aggregate annual CCS statistics, so project-level performance had to be reconstructed indirectly. A cross-border netting entry would be harder still to check from outside.
| Claim route | Who owns the tonne | What an auditor can verify | Main risk |
|---|---|---|---|
| Separate books | Producer for Scope 1; customer for combustion | Plant meter, registry entry, disclosed range | Reader may still assume equivalence |
| Netting on the cover | Named counterparty after waiver | Contract plus registry transfer | Double claim if no registry spans the cargo |
Conclusion: yes, and it fails on sequencing, not on arithmetic. Four planks: combustion is already priced where it occurs through excise, carbon pricing and efficiency rules, so charging the producer again double-taxes one event; responsibility can move by contract using registry exclusivity logic; refusal carries a cost, since capacity sized on the OGCI outlook loses its revenue case if importers decline recognition; and critics are loud — an r/energy commenter argued capture cuts a power plant's efficiency significantly, and accounting games strengthen that critique. Each plank concedes more than it asserts. Contractual transfer presumes both registries recognise the same tonne moving, and no multilateral registry has that authority for exported fuel today. A pledge that nets records a claim no counterparty has waived; the borrowing surfaces when a buyer's regulator audits. Disclosure costs a producer nothing except the temptation.
Conclusion: only two conditions change the answer. First, a treaty-grade process beginning at COP31 or later creates a registry with exclusive claims and verified custody from wellhead to stack, and importing jurisdictions formally waive their inventory share for transferred tonnes; then netting is a disclosed transfer and separate covers add nothing. Second, producer states accept capped, priced liability for exported combustion with both sides booking the same number; then separation is paperwork. Neither appears in the public material available to me, and whether COP31's agenda reaches this ledger is unclear on that same material.
Conclusion: most failures are clerical, not technical. Three recur: calling gross captured "net removal" while ignoring the energy the capture chain consumes; reporting CO2e while leaving methane and nitrous oxide off the page; and treating avoided emissions as if atmospheric carbon had been removed. A fourth is selling a credit before leakage monitoring and long-term liability are funded — under the 2026 checklist those are the items that decide whether a tonne survives audit. A pledge that never states which of the three quantities it reports is unreadable by design.
Conclusion: write the ledger before the marketing line. A producer drafting a pledge can work down this order:
Importers owe the mirror image: score upstream intensity on delivered fuel and decline netting no registry vouches for. The replicable frame is one page per source, one owner per tonne, one flag on the cover; that costs less than a cross-border dispute over who counted first.
It reduces the operator's Scope 1. The combustion tonne stays in the importing country's inventory unless a registry with exclusive claims moves it, with a waiver on both sides.
On the public material reviewed here, that is unclear. The position changes only if a treaty-grade registry with verified custody and importer waivers appears, or if producer states accept capped, priced liability for exported combustion.
Gross captured is what the plant strips from its stream; net removal subtracts supply-chain energy, conversion, transport and storage. Avoided emissions are a third quantity and are not removals.