By Nora Gonzalez, Manufacturing Transformation Consultant · Field Practitioner, GreencarbonWorld
A project team trying to cut embodied carbon can publish an efficient design, a resilience plan and a certification target, then still buy steel and cement on documents that say little about the specific products. My judgment is direct: a project marketed as green should publish product-level environmental product declarations for the steel and cement it procures, together with the procurement thresholds behind the selection, before it counts climate benefit from those materials. That judgment would fail if verified product data did not change purchasing decisions, or if disclosure costs outweighed measurable emissions reductions.
Green-building announcements tend to describe systems and intentions: efficient equipment, durable design, recycled content, a certification route. Steel and cement sit in a less comfortable part of the story. Their emissions are largely set when materials are specified and bought, before the building has an operating record. A project can look careful on paper, and the material basis for its important embedded choices can remain hard to trace.
The public record supports that concern. A GMCA framework states that cement and concrete are responsible for approximately 8% of global greenhouse gas emissions. An NRDC article says concrete products often calculate cement emissions with industry averages rather than actual cement product carbon data, limiting the force of green procurement. The World Resources Institute notes that main product-level green procurement initiatives and policies for cement and steel come with varying definitions of the regulated material. Those are source claims. My view is that a project should leave a material contribution unclaimed when its product-level data are absent.
An environmental product declaration, or EPD, tied to product category rules gives a buyer a named basis for comparison. A cement and concrete procurement guide notes that EPDs using relevant product category rules can be included in contracts. Cement or steel that looks similar on a drawing can carry different emissions because of process, electricity, feedstock and plant controls. A green claim should name the product basis that supports it.
The rule can be written into a tender. Before a project counts climate benefits from materials, it should publish product-level environmental product declarations for the steel and cement actually procured, along with the emissions thresholds used to select them. Each threshold should state the accepted emissions intensity for the product category, the handling of exceptions, and whether a substitute product met the required data standard.
Carbon terms need tight handling. Scope One covers direct fuel use controlled by the reporting company. Scope Two covers purchased energy consumed by the company. Scope Three covers value-chain emissions linked to purchased goods and services, where steel and cement bought for a project usually sit. CCER means Chinese Certified Emission Reduction credits, an offset instrument that belongs in a separate account from the physical emissions in a beam or a bag of cement. Credits can support mitigation elsewhere. They leave the embodied carbon of the purchased product unchanged.
Disclosure also changes the behavior of the design team. Once product data sit beside the bill of quantities, engineers and cost managers can see whether a specification change affects carbon or only appearance. Where an EPD is missing, the project should say so, use a conservative proxy as a temporary placeholder, and write a contract requirement for replacement data. The claimed benefit should fall until the missing data arrive.
Anyone who has collected supplier emissions data understands the friction. Mills and concrete producers may use different declaration programs, product category rules, allocation methods or data boundaries. Procurement teams may hold price and delivery information; sustainability teams may hold carbon spreadsheets. Many firms get stuck at Scope Three because supplier data are uneven. That is a working problem, and it needs a workable contract design.
Company case material from Dassault Systèmes reports 173t of avoided steel production and 264.844tCO2e avoided in a construction case. It also says emerging product-level emissions standards require verifiable lifecycle data, and that the same underlying data point feeds the ESG report and the cost analysis. Those results are indicative, not sector-wide proof. They show a practical mechanism: product-level data can support both environmental reporting and buying decisions at the moment a price is accepted.
The strongest objection concerns market design. A hard EPD-only rule could favour large suppliers with dedicated sustainability teams, exclude smaller plants that hold credible data that may be less polished, and delay bids. It could create false precision where product category rules, plant boundaries or allocation choices differ. GMCA's cement and concrete framework shows that the sector is still working through attribution methods such as book and claim, and procurement guidance flags mass balance as an accounting issue.
The response is a phased rule with wider acceptable evidence and a firm threshold. Equivalent verified product data can be accepted where an EPD is not yet available. Project owners can publish the product category rules behind each comparison and give smaller suppliers time to meet the data requirement. Approved exceptions should appear in the public green claim. These changes reduce exclusion and false precision. Report book-and-claim instruments separately from physical product data unless the chain of custody is clear.
Public purchasing gives this proposal a route into real contracts. Research on green public procurement in China estimates that around one-third of total annual steel and cement demand in China is used for public construction. European procurement research estimates a lead market for low-carbon cement at 31% of the total EU cement market. These figures leave room for caution about buyer readiness. They also show that procurement can create demand for products with verifiable carbon performance.
A tender test can be written without waiting for a global standard. Ask bidders to submit product-level declarations for the steel and cement they intend to use. State the emissions threshold before bids are scored. Require a substitution plan when the named supplier cannot meet the data requirement. Record any approved exception in the public green claim. The contract then carries the data requirement into supplier selection and substitution decisions.
Official statistics also show that material markets can be described in detail. GOV.UK's construction materials commentary publishes information on selected materials and components, including cement and concrete reinforcing bars. Climate claims need that level of traceability.
The same discipline helps finance teams. Product-level data can be tied to purchase orders, which makes it easier to compare a lower-carbon mix with its actual cost at the point of decision. The Dassault Systèmes material says the same underlying data point can feed environmental reporting and cost analysis. A green premium is easier to discuss when the buyer knows which product created it and which emissions were avoided.
There is a reputational reason as well. A project that discloses thresholds and exceptions may look less polished at launch. It will age better. When auditors or regulators ask how the material claim was built, the answer sits in documents created during procurement.
Use this order: